Waste & Recycling

Finance for the kit that keeps cycling.

RCVs, hookloaders, skip wagons, balers, shredders, sweepers and transfer-station kit — funded by lenders who understand municipal contracts and gate-fee economics.

£23m+

Funded into UK waste

84mo

Typical RCV term

0–10%

Typical deposit

Sector

Specialist lenders only

Assets we fund in Waste & Recycling

If it earns its keep, we've probably funded one.

RCVs & municipal

Refuse collection vehicles, food waste collection, recycling kerbside collection. Dennis Eagle, Faun, Heil, NTM.

Hookloaders & skip wagons

Skip lorries, hookloaders, RoRo, multi-lift bodies. Hyva, Marrel, Boughton bodies on Mercedes/MAN/Volvo chassis.

Balers & compactors

Vertical, horizontal, channel balers for cardboard, plastic, metal. Static and mobile compactors.

Shredders & screens

Slow-speed, high-speed shredders, trommel screens, picking lines, eddy-current separators.

Sweepers

Truck-mounted, compact, pavement sweepers. Johnston, Schmidt, Scarab, Hako.

Transfer station fit-out

Walking floors, weighbridges, tipping bays, dust suppression, fire suppression. Built as full project finance.

Typical deal profile

How waste & recycling deals usually structure.

Typical ticket

£80k – £350k per machine

Range we fund

£25k baler → £1m transfer station fit-out

Term

60 – 84 months

Deposit

0 – 15%

Structure

HP for asset retention; lease for RCV refresh cycles; refinance against installed sorting infrastructure ahead of contract bids.

Where the high street fails

The usual pain.

  • Specialist bodies confuse generalists

    A 4-year-old Faun Variopress on a Mercedes Econic has a specific value. Mainstream lenders won't touch it. Specialists will.

  • Municipal contracts have long lead times

    Award letter today, mobilisation in 60 days. We can credit-approve early and pay deposits to lock build slots.

  • Banks see 'environmental risk'

    Generic credit teams panic at fire and contamination risk. Sector-specialists understand the actual liability profile.

The AssetFi edge

How we structure it.

  • Waste-specialist underwriting

    Two of our lenders fund nothing but waste, recycling and resource recovery. Sharper rates because they price residuals correctly.

  • Municipal-contract aware

    Lenders who'll underwrite on signed contract evidence — including local-authority awards and rolling commercial contracts.

  • Transfer-station project finance

    We've funded full transfer station fit-outs with weighbridges, walking floors and sorting lines as integrated projects.

Reviewed by UK businesses

4.9out of 5 · 642 reviews

Sorted in 36 hours

"Bank wanted three weeks just to look at the file. AssetFi had the agreement signed and the digger paid for in 36 hours. Couldn't fault them."
Sarah M. · Director, Bromley Plant Hire

Genuinely no fees

"I'd been stung by brokers before so I asked twice — really, no fees? Confirmed in writing. Got a sharper rate than my bank too. They've now done four vans for me."
James O. · Owner, Tyneside Logistics

Understood our cash flow

"We needed a CBCT scanner but our last accounts had a bad quarter. AssetFi went to specialist healthcare lenders, came back with three options and explained each properly. Brilliant."
Priya R. · Practice Manager, Forest Dental

Our panel

Lenders we use for waste & recycling

Independent of any single lender. We place every deal with the funder offering the best fit on rate, structure and speed.

Aldermore
Allica Bank
Cambridge & Counties
Close Brothers
Compass Business Finance
Funding Circle
Haydock Finance
Hitachi Capital
Investec
Lombard
Novuna Business Finance
Paragon Bank
Praetura
Shawbrook Bank
Shire Leasing
Time Finance
United Trust Bank
White Oak UK

Plus 40+ specialist funders covering challenger banks, asset-specific lenders and tier-2 underwriters. Lender names shown are trademarks of their respective owners.

FAQs

Questions waste & recycling customers ask.

Will lenders fund used RCVs?

Yes — waste-specialists fund vehicles up to 7 years old with documented service history and emissions compliance. Body refurbishment can be bundled in.

Can finance cover transfer-station fit-out?

Yes — including walking floors, weighbridges, tipping bays, dust and fire suppression. Funded as integrated projects, typically 60–84 month HP.

What about contracts with new local-authority awards?

Specialist lenders will underwrite on the signed award, even before mobilisation. Conditional approval can sit alongside your contract bid.

Are seasonal or contract-aligned profiles available?

Yes — payment profiles can be aligned to monthly municipal billing cycles or seasonal commercial waste flows.

Ready to fund the next bit of waste & recycling kit?

Soft search. 24-hour decisions. No broker fees, ever.

Other sectors